Adding or Removing Document and Drawing Revisions in C-Link

This guide provides step-by-step instructions on how to add or remove a document or drawing revision as part of your tender or contract process in C-Link.

Estimated Read Time: 3 Minutes ⏱

It is recommended that you familiarise yourself with the Document Management section before proceeding with this guide.


Sections in this Article:


📋 Viewing Attached Documents and Drawings

To begin managing document or drawing revisions:

  1. Check Completion:
    • Ensure your tender is 100% complete with all questions answered.
  2. View Attached Files:
    • Look at the attached drawings and documents. For example, under "Structural," you might see a file like "Staircase B12."
  3. Scroll to File List:
    • Scroll down to the bottom of the page to view all attached files, including those listed under "Structural."

🛠️ Removing a Document or Drawing

Follow these steps to remove a document or drawing revision:

  1. Delete File:
    • Click the delete button next to the file you wish to remove (e.g., "Staircase B12").
    • Confirm the deletion. The file will be removed from the numbered documents list.

📤 Adding New Document or Drawing Revisions

After removing old files, add new revisions:

  1. Upload New Files:
    • Click "Upload" to add new documents or drawings.
    • Navigate to the appropriate folder (e.g., "Structural") and select the files to upload. For example, "Latest B12 Detail" and "Existing Elevations."
  2. Automatic Update:
    • The system will upload the new files and display them in the document list.
    • These files will also be automatically added to the numbered documents list in your tender or contract document.

Summary ✅

This guide has outlined the process for adding or removing document and drawing revisions in C-Link. Following these steps ensures your tender and contract documents are up-to-date with the latest revisions.