How to Remove a Package in C-Link

This guide provides step-by-step instructions on how to remove a package from your project in C-Link.

Estimated Read Time: 3 Minutes ⏱

It is recommended to familiarise yourself with the Package Management section before proceeding with this guide.


Sections in this Article:


🖥️ Accessing the Project Dashboard

To begin removing a package from your project, follow these steps:

  • Log into C-Link:
    • Navigate to your project dashboard.
    • You will see existing packages, such as groundworks, roofing, piling, plumbing and heating, and aluminium doors and windows.

📦 Navigating to the Packages Page

To access the package management section:

  • Update Packages:
      • Click "Update Packages" from the project dashboard.
      • You will be directed to the trades page.
  • Create Packages:
    • Go to the next step by clicking "Create Packages".
    • You will see a list of your current packages.

✂️ Removing a Package

Follow these steps to remove a package:

  • Select Package to Remove:
      • Identify the package you want to delete. For example, "aluminium doors and windows" or "piling".
  • Delete Package:
      • Click the delete button next to the package name to remove it.
      • Repeat the process for any other packages you wish to delete.
  • Important Considerations:
      • Be mindful that deleting packages will remove them from your project timeline.
      • Any interests, supply chain contacts, tender documents, or contract documents associated with the package will also be deleted.
  • Save Changes:
    • Press "Save Packages" to finalise the deletion.
    • The system will update, and the deleted packages will no longer appear on your project dashboard or timeline.

Summary ✅

This guide has outlined the process for removing packages from your project in C-Link. Ensure you only delete packages if they are no longer needed to avoid losing important data.

🎥 Full Walkthrough Video

For a comprehensive guide, watch the full walkthrough video below: