This guide provides step-by-step instructions on how to remove a package from your project in C-Link.
Estimated Read Time: 3 Minutes ⏱
It is recommended to familiarise yourself with the Package Management section before proceeding with this guide.
Sections in this Article:
- 🖥️ Accessing the Project Dashboard
- 📦 Navigating to the Packages Page
- ✂️ Removing a Package
- 🎥 Full Walkthrough Video
🖥️ Accessing the Project Dashboard
To begin removing a package from your project, follow these steps:
- Log into C-Link:
- Navigate to your project dashboard.
- You will see existing packages, such as groundworks, roofing, piling, plumbing and heating, and aluminium doors and windows.
📦 Navigating to the Packages Page
To access the package management section:
- Update Packages:
- Click "Update Packages" from the project dashboard.
- You will be directed to the trades page.
- Create Packages:
- Go to the next step by clicking "Create Packages".
- You will see a list of your current packages.
✂️ Removing a Package
Follow these steps to remove a package:
- Select Package to Remove:
- Identify the package you want to delete. For example, "aluminium doors and windows" or "piling".
- Delete Package:
- Click the delete button next to the package name to remove it.
- Repeat the process for any other packages you wish to delete.
- Important Considerations:
- Be mindful that deleting packages will remove them from your project timeline.
- Any interests, supply chain contacts, tender documents, or contract documents associated with the package will also be deleted.
- Save Changes:
- Press "Save Packages" to finalise the deletion.
- The system will update, and the deleted packages will no longer appear on your project dashboard or timeline.
Summary ✅
This guide has outlined the process for removing packages from your project in C-Link. Ensure you only delete packages if they are no longer needed to avoid losing important data.
🎥 Full Walkthrough Video
For a comprehensive guide, watch the full walkthrough video below: