Using the C-Link Cost Planning Tool

This guide provides step-by-step instructions on how to use the C-Link cost planning tool to create a simple cost plan for your project.

Estimated Read Time: 2 Minutes ⏱

Before proceeding with this guide, you should familiarise yourself with the Project Dashboard and Cost Planning Tool sections.


Sections in this Article:


🖥️ Accessing the Cost Planning Tool

To begin using the cost planning tool:

  • Log into C-Link:
      • Navigate to your project dashboard upon logging in.
  • Open Cost Planning Tool:
    • Click on the "Cost Planning Tool" to start the process.

📄 Inputting Project Details

Follow these steps to input your project details:

  • Building Type:
      • Select whether it's a new build, existing, or combined. For example, select "New Build".
  • Frame Construction:
      • Choose the frame construction type: Timber, Steel, Brick and Block, etc.
  • Foundation Type:
      • Select the type of foundation: Strip, Raft, Pad, or Unsure.
  • Basement and Piling:
      • Indicate if there is a basement and if there is piling.
  • Specification Level:
      • You can choose the specification level of the fit-out: low (Housing Association), Ultra-High End, High-End Residential, or somewhere in between.
  • Additional Details:
      • Input the number of lifts, project address (auto-pulled), location (e.g., London), and start date on site. The system will factor and index the start date.
  • Total GIA:
      • Enter the total Gross Internal Area (GIA) for private space, communal space, soft landscaping, and hard landscaping.
  • Send Cost Breakdown:
    • Press the "Send me the cost breakdown" button.

📤 Generating the Cost Plan

To generate and review the cost plan:

  • Output PDF:
      • The system will generate a PDF report summarising your cost plan based on your inputs.
  • Review Report:
      • The report includes a summary of your inputs, a breakdown of costs by component (e.g., shell and core, fit-out, internal walls), project specifics, lifecycle costs, and indexed factors for time and location.
  • Rework the Plan:
    • You can go back and rework the cost plan as needed and use the tool multiple times.

Summary ✅

This guide outlines the process for using the C-Link cost planning tool. Following these steps ensures that your cost plans are accurate and comprehensive.

🎥 Full Walkthrough Video

For a comprehensive guide, watch the full walkthrough video below: